16:30What Will 5D BIM Mean for Cost Managers? | The B1M
From the creator
What will the 5D aspect of building information modelling (BIM) mean for Cost Managers, Estimators and Quantity Surveyors? Here Trevor Woods explains what 5D BIM is, how it will impact those engaged with costing and where best to start. “5D BIM is where we’ve taken the graphical 3D model and appended cost information to it to rapidly produce estimates” he explains. This has freed up Cost Managers’ time and enabled them to add greater value by validating information and verifying that scope has been accurately captured. The efficiency of the BIM workflow – particularly in this case for designers – is allowing for rapid iteration of proposals. Trevor points out that this will translate into changes coming ‘thick and fast’ at Cost Managers: “We simply have to embrace BIM” he says. “Manual methods of measuring are just too slow”. Under the conventional approach, Cost Managers develop estimates on completed designs. “We don’t help designers design to cost” explains Trevor. 5D BIM in his opinion, allows Cost Managers to quickly price iterations and provide real-time feedback to their project team peers, helping them develop proposals in line with set budgets. In terms of where to start, Trevor suggests taking an element of a building (such as its structural steelwork or duct work) and running a 5D costing exercise on that package in isolation. He recommends doing a 2D exercise alongside in the first instance to help build trust and confidence around the outcome. “Start sma
Published 2016-02-19 · Watch on YouTube ↗
Availability and playback restrictions are controlled by the original channel.
Keep exploring Engineering
16:30
01:49
01:54
01:37
02:11
01:49Pharmaceutical Machinery & Spares by Bhavani Engineering Works, Ahmedabad
IndiaMART InterMESH Ltd
09:27Lloyds Engineering Works Limited share LATEST News today | Lloyds Steel Industry latest news today
The Share Shiksha