20:52Super Heavy Quick Disconnect Extends | SpaceX Boca Chica
From the creator
Crews test Super Heavy's quick disconnect system as its hood is prepared for installation at the Production Site. Meanwhile, more liquid nitrogen is delivered to the Orbital Tank Farm. Video and Pictures from Mary (@BocaChicaGal), Nic (@nicansuini), and the NSF Robotic Team. Edited by Derek “DK” Knabenbauer (@DKlarations). All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF. Click "Join" for access to early fast turnaround clips, exclusive discord access with the NSF team, etc - to support the channel. Rolling Updates and Discussion: https://forum.nasaspaceflight.com/index.php?board=72.0 Articles: https://www.nasaspaceflight.com/?s=Starship NSF Store: https://www.nasaspaceflight.com/shop/ L2 Boca Chica (more clips and photos) from BC's very early days to today. https://forum.nasaspaceflight.com/index.php?topic=47107.0 (Join L2 and support NSF here: https://www.nasaspaceflight.com/l2/) 0:00 - Booster Quick Disconnect Extending 0:26 - Orbital Launch Mount Construction 2:06 - Crews Work on the Chopsticks 2:26 - Work at the Landing Pad Area 4:08 - B2.1 Test Tank on Booster Test Stand 4:28 - Nitrogen Deliveries at the Orbital Tank Farm 5:11 - Ship 20 7:10 - Booster 4 7:30 - Wide Bay Construction 9:24 - Work at the Production Site 10:04 - Beams for the Wide Bay 10:44 - Booster Quick Disconnect Hood 11:24 - Ship 21 Tank Section in Mid Bay 12:24 - Booster 5 in High Bay
Published 2021-11-23 · Watch on YouTube ↗
Availability and playback restrictions are controlled by the original channel.





