51:45New Cryo Tank Shell Grows Taller as the Launch Site Prepares for Windy Days | SpaceX Boca Chica
From the creator
After the Liebherr LR 11350 lifted the NOV ADS-30Q hoist onto the Launch Tower base, it was reattached to the top of the tower. Meanwhile, crews add and align new ring sections to a Cryo Tank Shell. Video, Photos, and Edit by Brady Kenniston (@TheFavoritist) All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF. Click "Join" for access to early fast turnaround clips, exclusive discord access with the NSF team, etc - to support the channel. Rolling Updates and Discussion: https://forum.nasaspaceflight.com/index.php?board=72.0 Articles: https://www.nasaspaceflight.com/?s=Starship NSF Store: https://shop.nasaspaceflight.com/ L2 Boca Chica (more clips and photos) from BC's very early days to today. https://forum.nasaspaceflight.com/index.php?topic=47107.0 (Join L2 and support NSF here: https://www.nasaspaceflight.com/l2/) 0:00 Crews Add New Ring Sections to Cryo Tank Shell 1:31 A GSE Forward Dome Outside the Tents 2:02 Starship SN20’s Aft Section Inside Tent 1 2:31 A Raptor Engine Partial Combustion Chamber & Nozzle 3:03 Sunrise 4:40 Inspection Robot Inside Tent 1 5:06 A GSE Tank Forward Section is also in the Tent 5:27 Ring Sections Outside the High Bay - Ring Was Attached to the Forward Left Ring Section Overnight 5:54 Crews Work on a Transport Stand Outside the High Bay 6:32 Orbital Launch Site 7:00 The NOV ADS-30Q Hoist Installed at the Tower Base 8:13 The Liebherr LR 11350 was Reattached to the Top 8:40 Liebherr LR 1600/2 Parts S
Published 2021-06-21 · Watch on YouTube ↗
Availability and playback restrictions are controlled by the original channel.





