10:18Liebherr LR 11350 Boom Disconnected for Extension | SpaceX Boca Chica
From the creator
In preparation for its extension, crews disconnected the Liebherr LR 11350's (Frankencrane) boom. Once extended it will be used to lift the eighth Launch Tower section into place. Meanwhile, the GSE 3 tank is moved into the Mid Bay and the eighth Launch Tower section's final column is lifted into place. Video & Photos from Mary (@BocaChicaGal) and the NSF Robotic Camera Team. Edited by Nathan Shields. All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF. Click "Join" for access to early fast turnaround clips, exclusive discord access with the NSF team, etc - to support the channel. Rolling Updates and Discussion: https://forum.nasaspaceflight.com/index.php?board=72.0 Articles: https://www.nasaspaceflight.com/?s=Starship NSF Store: https://shop.nasaspaceflight.com/ L2 Boca Chica (more clips and photos) from BC's very early days to today. https://forum.nasaspaceflight.com/index.php?topic=47107.0 (Join L2 and support NSF here: https://www.nasaspaceflight.com/l2/) 00:00 - SpaceX Boca Chica 00:20 - Night Crew Works on Booster 3 00:40 - Booster 3 and Orbital Launch Tower 01:00 - Cryo Shell Work Continues 02:50 - GSE3 (Left) and S20 (Right) in the Midbay 03:40 - GSE3 in the Midbay 04:20 - Ring Section in Production 05:00 - Ring Sections Await Stacking 05:20 - Parts for Mystery Structure 06:00 - Mystery Structure Work Continues 06:50 - Propellant Production Site 07:00 - Work on Orbital Launch Tower Segment 8 at Propellant Production Sit
Published 2021-07-08 · Watch on YouTube ↗
Availability and playback restrictions are controlled by the original channel.





