03:23Framing Around Cribbing | This Old House
From the creator
With the Bay Head house now lifted four feet and stabilized on cribbing, the crew has to frame the new first floor around the cribbing—a tricky construction sequence with improvements also planned for the second floor. SUBSCRIBE to This Old House: http://bit.ly/SubscribeThisOldHouse. After last episode's lift, the Bay Head cottage is now sitting four feet in the air on a forest of cribbing—and the crew has to build an entirely new first floor beneath it without disturbing that support structure. Framing around cribbing is not standard practice; every beam, post, and joist has to be fit around the temporary supports still holding the house up. On top of that, the second floor is getting improvements that weren't in the original plan—changes that have to be coordinated now, before the walls close up. Looking for more step by step guidance on how to complete projects around the house? Join This Old House Insider to stream over 1,000 episodes commercial-free: https://bit.ly/2GPiYbH Want weekly tips, project guides, and behind-the-scenes content from the TOH crew? Sign up for our free newsletter here: https://www.thisoldhouse.com/pages/newsletters Plus, download our FREE app for full-episode streaming to your connected TV, phone or tablet: https://www.thisoldhouse.com/pages/streaming-app Where to find it? General contractor: Kevin D’Anunciaçao Construction Group About This Old House TV: This Old House is America’s first and most trusted home improvement show. Each season,
Published 2026-08-24 · Watch on YouTube ↗
Availability and playback restrictions are controlled by the original channel.





