After 900-miles and six days at sea, ET-122, the external fuel tank that will power the last planned space shuttle flight into orbit is now inside the Kennedy Space Center's Vehicle Assembly Building being prepped for mission STS-134.
Published 2010-09-28 · Watch on YouTube ↗ Availability and playback restrictions are controlled by the original channel.