03:04How Voyager Changed Our View of the Solar System (NASA Archival Footage)
NASA Jet Propulsion Laboratory
Space shuttle Discovery's launch for the STS-133 mission has been targeted for no earlier than February 3, 2011 to allow for more testing on two 21-foot-long, U-shaped aluminum brackets, called stringers, on the shuttle's external tank. NASA repaired the cracks and reapplied foam to the exterior of the stringers. Engineers will continue to search for the root cause of the stringer cracks through data analysis and tests, including placement of manufacturing defects in separate stringers to demonstrate structural integrity in an effort to duplicate the same type of failure that occurred in November. Engineers and technicians will also inspect the tank for evidence of any foam cracking as it would on an actual launch day. Because of Discovery's delayed launch, the earliest opportunity for the liftoff of the final scheduled shuttle mission, STS-134 on Endeavour, is April 1.
Published 2010-12-03 · Watch on YouTube ↗
Availability and playback restrictions are controlled by the original channel.
Allow Google Analytics to measure visits. Your history stays in your browser. Privacy details