tubeshowcase●1,670,700 videos♡ My collection 0
← Space

Space12:12

Deluge testing ahead of 33 engine Static Fire | SpaceX Starbase

NASASpaceflight ↗

From the creator

Booster 20 sections are being assembled in Mega Bay 1 while the water bags return to Pad 2, which also undergoes deluge testing ahead of Booster 19's 33 engine Static Fire test. ⚡ Become a member of NASASpaceflight's channel for exclusive Discord access, fast turnaround clips, and other exclusive benefits. Your support helps us continue our 24/7 coverage. Click JOIN above to get started.⚡ Narration by Ryan Caton. 🎥 Video from Ceaser G, Gage, Colleen, and Starbase Live. ✂️ Edited by Thomas Hayden (@_thomashayden). 🔍 If you are interested in using footage from this video, please review our content use policy: https://www.nasaspaceflight.com/content-use-policy/ L2 Boca Chica (more clips and photos) from BC's very early days to today. 🔗 https://forum.nasaspaceflight.com/index.php?topic=47107.0 (Join L2 and support NSF here: https://www.nasaspaceflight.com/l2/) Timestamps: 0:00 Short Deluge Test 0:26 Longer Deluge Test 0:50 Short Top Deck Test 1:21 Longer Top Deck Test 2:10 Pad 2 Tank Farm Testing 2:20 SQD Methane Line Defrosts 2:31 Pad 2 DSS Tests 2:44 Ship QD Arm Retracted 2:56 Water Bags Hooked to SQD Arm 3:22 Water Bags Filled 3:36 Pad 2 Deluge Test 3:57 Orbital Pad 2 4:18 Clamp Arm Doors Painted 4:46 Pad 2’s Chopsticks 4:56 Pad 2’s Ship QD Arm 5:18 Top of Pad 2’s Tower 6:08 Grinding on Pad 1’s Chopsticks 6:30 Venting From the Tank Farm 7:00 Gigabay Construction Continues 8:02 Starfactory Cladding Reconfigured 8:23 Ship 40 in Mega Bay 2 8:45 Booster Forward Section 8:57

Published 2026-04-09 · Watch on YouTube ↗
Availability and playback restrictions are controlled by the original channel.

Keep exploring Space