08:31Cleaning up Fukushima: Decommissioning work continues on nuclear power plant • FRANCE 24 English
From the creator
Decommissioning the Fukushima Daiichi nuclear power plant in Japan began soon after it suffered a triple meltdown in March 2011. Fourteen years on, the work continues. This summer will mark two years since Tokyo Electric Power Company, the plant’s operator, began discharging water that was used to cool the damaged reactors into the sea. In November last year, workers removed a few grams of radioactive debris from a reactor for the first time. A second extraction took place a few weeks ago. Neighbourhoods closest to the plant are still off-limits, but other areas are safe to live in. For some residents, life is slowly returning to normal. Justin McCurry, Alexis Bregere and Airi Futakuchi Report. #Japan #Fukushima #nuclear power 🔔 Subscribe to France 24 now: https://f24.my/YTen 🔴 LIVE - Watch FRANCE 24 English 24/7 here: https://f24.my/YTliveEN 🌍 Read the latest International News and Top Stories: https://www.france24.com/en/ Like us on Facebook: https://f24.my/FBen Follow us on X: https://f24.my/Xen Bluesky: https://f24.my/BSen and Threads: https://f24.my/THen Browse the news in pictures on Instagram: https://f24.my/IGen Discover our TikTok videos: https://f24.my/TKen Get the latest top stories on Telegram: https://f24.my/TGen
Published 2025-05-19 · Watch on YouTube ↗
Availability and playback restrictions are controlled by the original channel.





