10:18Booster 6 Aft Dome Ready for Sleeving | SpaceX Boca Chica
From the creator
The aft dome for Booster 6 was readied for sleeving as crews continue to work on Ship 21. Meanwhile, Perlite expansion furnaces were spotted at the launch site. Perlite is used as an insulator between the cryo shells and GSE tanks. Video and Pictures from Mary (@BocaChicaGal) and Nic (@NicAnsuini). Edited by Derek "DK" Knabenbauer (@DKlarations). All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF. Click "Join" for access to early fast turnaround clips, exclusive discord access with the NSF team, etc - to support the channel. Rolling Updates and Discussion: https://forum.nasaspaceflight.com/index.php?board=72.0 Articles: https://www.nasaspaceflight.com/?s=Starship NSF Store: https://www.nasaspaceflight.com/shop/ L2 Boca Chica (more clips and photos) from BC's very early days to today. https://forum.nasaspaceflight.com/index.php?topic=47107.0 (Join L2 and support NSF here: https://www.nasaspaceflight.com/l2/) 0:00 - Sunrise at Boca Chica 0:20 - The Launch Site 0:57 - The Orbital Tank Farm 1:51 - Perlite Expansion Furnaces \ Perlite is used as an insulating layer between the cryo shells and GSE tanks 2:15 - Ship 20 \ Ship 20 recently completed its first static fire tests 3:02 - Booster 4 Work Continues 3:21 - Crews Work on the Orbital Launch Tower 4:36 - Left to Right: Booster 4, Ship 20, and Booster 3's Remains // Starhopper standing watch 5:04 - Booster 6 Aft Dome Ready for Sleeving 5:37 - Methane Transfer Tube for New Booster
Published 2021-10-26 · Watch on YouTube ↗
Availability and playback restrictions are controlled by the original channel.





