08:51Ballast Bags Attached to Mechazilla's Chopsticks for Load Testing | SpaceX Boca Chica
From the creator
Ballast bags were attached to the Chopsticks, the yellow Buckner LR 11000 crane lowered its boom, and scrapping of Booster 3 continued. Video and Pictures from Mary (@BocaChicaGal) and Nic (@NicAnsuini). Edited by Jack (@theJackBeyer). All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF. Click "Join" for access to early fast turnaround clips, exclusive discord access with the NSF team, etc - to support the channel. Rolling Updates and Discussion: https://forum.nasaspaceflight.com/index.php?board=72.0 Articles: https://www.nasaspaceflight.com/?s=Starship NSF Store: https://www.nasaspaceflight.com/shop/ L2 Boca Chica (more clips and photos) from BC's very early days to today. https://forum.nasaspaceflight.com/index.php?topic=47107.0 (Join L2 and support NSF here: https://www.nasaspaceflight.com/l2/) 0:00 - Sunrise 0:28 - Ship 21 Nosecone and Wide Bay Construction 0:42 - Wide Bay Construction 0:57 - Hydraulic Rams Loaded Onto Truck 1:56 - Booster Forward Dome 2:35 - Booster Forward Dome Sleeve 3:03 - Wide Bay Construction 3:42 - B2.1 Test Tank, B5, SN15, and Ship 16 4:11 - BN2.1 and B2.1 Test Tanks 4:48 - Workers Use Percussive Maintenance on B2.1's Access Hatch 5:21 - Ship Aft Flap with TPS Tiles 5:44 - Buckner LR 11000 Crane Lowers Its Boom 6:08 - Buckner LR 11000 Crane With Lowered Boom 6:32 - New Structure Near the Propellant Plant 6:56 - Scrapping of Booster 3 Continues 10:01 - Ballast Bags Attached to the Chopsticks 11:35 - Q
Published 2022-01-12 · Watch on YouTube ↗
Availability and playback restrictions are controlled by the original channel.





