44:56Artemis 1 moon rocket fueling resumes after leak detection
From the creator
NASA has resumed liquid hydrogen flow for today's (Sept. 3) Artemis 1 moon rocket tanking. The team lost about 30 minutes during the pause to troubleshoot a fuel leak in the hydrogen supply line of the Space Launch System's core booster. Launch scrubbed: https://www.space.com/artemis-1-launch-scrub-hydrogen-leak Fueling of both liquid hydrogen and liquid oxygen is continuing. Credit: NASA
Published 2022-09-03 · Watch on YouTube ↗
Availability and playback restrictions are controlled by the original channel.





